Decommissioning

FCS Group, in collaboration with our strategic partners in heavy lift and well plugging and abandonment are able offer end to end Engineering, Preparation, Removal and Disposal (EPRD) service. 

We can support clients in preparing for COP, developing options and strategies, undertaking detailed engineering for well P&A and structural verifications, executing the lift and transportation to shore, dismantling, waste management and recycling. 

The FCS Group has a strong partnership with  Versa UK which was established in 2020 and utilises proven lifting solutions from their partner Vesabar Inc in the US who have completed over 200 topsides and jacket lifts and over 100,000 rigging and lifting projects.

This enables us to provide highly cost effective and innovative yet proven solutions to the decommissioning sector. 

Versa UK offers a 5th generation, platform based conduction removal system which is versatile in its method of assembly and has minimal footprint requirement providing significant cost savings as a rigless solution.

The Versatruss system is another innovative  solution for installation and removal of topsides up to 27,000t. The system can be quickly deployed from a base in the Gulf of Mexico and utilises locally sourced barges providing a highly cost effective solution compared to using heavy lift vessels which are in high demand globally across the oil & gas and offshore wind sectors. 

Please get in touch to obtain more detail on the services we can provide and the projects we have delivered.